Boukendour, S and Hughes, W (2014) Collaborative incentive contracts: stimulating competitive behaviour without competition. Construction Management and Economics, 32(03), 279-89.

Clegg, S and Kreiner, K (2014) Fixing concrete: inquiries, responsibility, power and innovation. Construction Management and Economics, 32(03), 262-78.

Davies, P J, Emmitt, S and Firth, S K (2014) Challenges for capturing and assessing initial embodied energy: a contractor’s perspective. Construction Management and Economics, 32(03), 290-308.

  • Type: Journal Article
  • Keywords:
  • ISBN/ISSN: 0144-6193
  • URL: https://doi.org/10.1080/01446193.2014.884280
  • Abstract:
    Initial embodied energy includes energy use during material, transportation, and construction life cycle phases up to project practical completion. Contractors have an important role to play in reducing initial embodied energy levels due to their significant involvement in preconstruction and onsite construction activities. Following an extensive literature review a comprehensive framework was designed to highlight the significance of initial embodied energy levels relative to specific construction packages, activities and subcontractors. This framework was then applied to a new UK industrial warehouse project using a case study approach. Capturing information from a live project during the entire construction phase helped highlight the practical challenges inherent when capturing and assessing initial embodied energy levels. A series of contractor current practices was reviewed to determine their compliance with the framework requirements. The findings revealed that the ground and upper floor, external slab and frame were the most significant construction packages in terms of embodied impacts. Many challenges embedded within the contractor?s current practices in terms of data detail, legibility, and terminology were also revealed. The framework provides a practical approach for initial embodied energy assessment which can readily be adopted by contractors to help highlight opportunities to increase efficiency.

Gajendran, T, Brewer, G, Gudergan, S and Sankaran, S (2014) Deconstructing dynamic capabilities: the role of cognitive and organizational routines in the innovation process. Construction Management and Economics, 32(03), 246-61.

Lloyd-Walker, B M, Mills, A J and Walker, D H T (2014) Enabling construction innovation: the role of a no-blame culture as a collaboration behavioural driver in project alliances. Construction Management and Economics, 32(03), 229-45.